The Last of the 60 Wind Turbine Generators Successfully Installed at Kipeto Wind Farm.
Posted onKipeto Energy on 31st May 2020 succesfully installed the last of 60 WTG’s with no Incidents recorded.
Kipeto Energy on 31st May 2020 succesfully installed the last of 60 WTG’s with no Incidents recorded.