Complete installation of the first 1.7 MW Wind Turbine Generator at Kipeto Wind Farm.
Posted onHaving completed the construction of the wind turbine foundations, Kipeto wind energy has successfully installed the first of the 60,1.7MW Wind Turbine Generator on 15th November 2019. This is a special lifting operation to install 3 tower sections, the nacelle and rotor. The wind turbine Generator is 130M at tip height and takes approximately 2 […]